HPC 2020

Announcements

Core Infrastructure

  • 2x R640 Head Nodes
  • 2x R640 Login Nodes
  • 2x R640 Transfer Nodes
  • High Speed Interconnect: HDR Infiniband
  • Storage: 3PB GPFS
  • 10x Dell R640 with 2 Intel 24 core 6248 Processors @3.0 ghz with 192GB memory
  • 2x Dell R6525 with 2 AMD 64 core EPYC 7662 Processors @ 2.0 ghz with 256GB Memory
  • Nvdia T40 GPU Nodes

Reservations

  • Reservation A: Intel 6248, 2×24 Cores, 192 GB RAM, 4-Year Term 
  • Reservation B: Intel 6248, 2×24 Cores, 384 GB RAM, 4-Year Term
  • Reservation C: Intel 6248, 2×24 Cores, 768 GB RAM, 4-Year Term 
  • Reservation D: AMD 7662, 2×64 Cores, 192 GB RAM, 4-Year Term
  • GPU Pricing Available on Request